Built in 2001, our gathering system is constructed of 4" pipe in the ground, and stretches 4.32 miles. It is located on the Brookshire Dome in Waller County, Texas, in the area of Peach Ridge Road and Donigan Road, with access to both the North and South side of I-10. The pipeline is connected to a dehydration station capable of delivering 10 million cubic feet of gas per day.
|